Application | High-pressure tailings disposal | Pump | MHPP-14TU
MHPP-14TU for High-Pressure Tailings Disposal
Project Background
A site needed to move tailings to a disposal area located some distance away, through a pipeline that demanded elevated head. Combined high head and high abrasion is one of the harder duties for a slurry pump — standard configurations tend to show short seal life and rapid impeller wear.
Operating Duty
Pump size: MHPP-14TU configured for high-pressure duty
Flow: approximately 600–800 m³/h
Head: high enough to hold pipeline pressure across the full disposal distance
Solids: tailings with a coarse abrasive fraction
Matec Solution
We configured the MHPP-14TU with heavy-section wet-end parts, a staged seal arrangement suited to the pressure, and a matched bearing assembly. A complete wet-end set and a duty-sized spare impeller were supplied together so the site could complete its first service without waiting on a second shipment.
Result
Pipeline pressure stayed stable through the disposal cycle and unplanned stops from seal or impeller issues reduced compared with the previous setup. The pump is now held on a scheduled wear-part replacement plan.

