Application | Wet-end parts optimization | Pump | MHPP-14TU
MHPP-14TU Wet-End Parts Optimization
Project Background
A concentrator running an MHPP-14TU pump reported that the existing wet-end parts were wearing faster than expected, and that the associated cyclone circuit occasionally produced an off-specification overflow. Maintenance wanted a parts strategy that would extend service intervals without changing the installed pump.
Investigation
After reviewing the operating data, the impeller wear pattern and the overflow photographs, the dominant cause was traced to the pump running significantly off its Best Efficiency Point, combined with a liner material that was not the best match for the actual particle distribution.
Adjustment & Supply
Re-selected the impeller profile to operate closer to the actual duty
Specified high-chrome impeller and matched liners for the abrasive part of the curve
Supplied a complete wet-end set with the new profile so the first service interval could be completed entirely on site
Result
Over the months following the change, the cyclones produced more consistent overflow and the maintenance team reported longer intervals between impeller replacements. The site continues to source replacement parts from us on a regular cycle.

