Heavy-section wet end and staged seal arrangement stabilised a long-distance tailings disposal line.

A long-distance tailings disposal line was experiencing pressure fluctuations and unplanned stops. The pump needed to deliver against a high static head at 80–120 m.
We supplied a heavy-section wet end, staged seal arrangement and matched bearing assembly. The pump was configured for the full pipeline curve, not just the static duty point.
Stable pipeline pressure and fewer unplanned stops. The site moved to scheduled wear-part replacement based on measured wear rates.
Share your current pump model and duty — we benchmark it against a Matec alternative.
Benchmark My Pump